FREE PDF GUIDE · 2026

Free Permitted Development Guide

How far can you extend without planning permission? Download our free 20-page visual guide to permitted development for London houses.

★★★★★ 5.0 on Google50+ projects completedFully insuredFree, fixed quotes
Free Quote
Tell us about your project
We reply within one working day.
services
Free download

Permitted Development, Explained in Pictures

Want to know how far you can extend your house without a full planning application? Our free 20-page guide turns the permitted development rules into clear 3D diagrams: front, rear and side extensions, roof heights, the 6m and 8m prior approval route, and the London catches most guides leave out.

  • Every limit drawn as a simple diagram
  • Checked against the government technical guidance, October 2026
  • Written for London houses, including conservation areas
  • Free, no sign-up needed
Download the free guide (PDF, 4 MB)
Decoding Permitted Development guide cover with an isometric house extension
Check first

Does Your Home Have Permitted Development Rights?

Permitted development (PD) is a set of building work that is already approved nationally, as long as it stays inside fixed limits. It applies to houses. Before you measure anything, check that your home is not one of these:

PropertyPermitted development rights
Flat or maisonetteNone. Any extension needs planning permission.
Listed buildingListed building consent needed for almost any change.
Article 4 areaSome or all rights removed by the council on certain streets.
Conservation areaReduced rights: no side, two-storey or 6m/8m extensions.
Newer estateRights may have been removed by a condition on the original planning permission.
Ordinary houseFull householder rights, as set out in the guide.
Which homes have permitted development rights: flats, listed buildings, Article 4 and conservation areas
Slide 3: the quick check every homeowner should do first.
Permitted development in conservation areas compared with ordinary houses
Slide 18: what changes in a conservation area.
The key rules

Permitted Development Limits at a Glance

All depths are measured from the original house: the house as first built, or as it stood on 1 July 1948 if older. Earlier extensions, even by previous owners, count against your allowance.

ExtensionTerraced or semiDetachedHeight and other limits
Single-storey rear3m4mMax 4m high. Eaves max 3m within 2m of a boundary.
Larger home extension (prior approval)6m8mSame heights. Neighbours consulted; council has 42 days. Not in conservation areas.
Two-storey rear3m3mAt least 7m from the rear boundary. Not in conservation areas.
Side extensionHalf the width of the original houseHalf the widthSingle storey, max 4m high. Not in conservation areas.
PorchMax 3m²Max 3m²Max 3m high, at least 2m from a boundary next to a road.
Wrap-around (L-shape)Not PDNot PDNeeds full planning permission.

Two rules apply to every extension: walls and roofs must look similar to the existing house, and all extensions and outbuildings together must not cover more than half the land around the house. Balconies, verandas and raised platforms over 0.3m are never PD.

Inside the guide

A Look Inside the Guide

Rear extension permitted development depth: 3m for terraced and semi-detached, 4m for detached
Rear extensions: 3m for terraced and semi-detached houses, 4m for detached.
Single-storey extension height limits: 4m maximum and 3m eaves within 2m of the boundary
Height near a boundary: 4m maximum, but eaves no higher than 3m within 2m of the fence.
Larger home extension through prior approval: up to 6m for semis and terraces, 8m for detached
Going deeper: up to 6m or 8m through prior approval, with neighbours consulted.
Side extension half-width rule under permitted development
Side extensions: no wider than half the original house, single storey only.
Wrap-around L-shaped extensions are not permitted development
Wrap-arounds: the popular L-shaped kitchen extension needs full planning permission.
Porch permitted development rules: 3 square metres, 3m high, 2m from the road
The front: nothing forward of the principal elevation except a small porch.
Permitted development depth limits table: 3m, 4m, 6m and 8m
The depth matrix: all four depth limits on one slide.
Lawful Development Certificate for a permitted development extension
Before you build: why a Lawful Development Certificate is worth getting.

Get all 20 pages (PDF, 4 MB)

Before you build

Get a Lawful Development Certificate

Permitted development needs no application, but we recommend applying to your council for a Lawful Development Certificate before work starts. The council checks your drawings against the PD rules: if they comply it must grant the certificate, and if not it will refuse and explain why. The certificate is legal proof that the extension is lawful, which buyers’ solicitors ask for when you sell. The fee is half the normal householder planning fee.

Permitted development covers planning only. You still need Building Regulations approval, Party Wall Act notices when building on or near a shared wall (see our party wall guide), and sometimes Thames Water consent to build near a public sewer.

Questions

Permitted Development FAQs

How far can I extend without planning permission?

A single-storey rear extension can go 3m from the original rear wall of a terraced or semi-detached house, or 4m for a detached house. Through prior approval (the larger home extension route) this rises to 6m and 8m.

Do flats have permitted development rights?

No. Flats and maisonettes have no householder permitted development rights, so any extension needs full planning permission. This includes many London houses that have been converted into flats.

Can I build a side return extension under permitted development?

Often yes, if it is single storey, no more than 4m high and no wider than half the width of the original house. In a conservation area, side extensions are not permitted development.

Is a wrap-around extension permitted development?

No. An L-shaped extension that wraps around the side and rear is not permitted development and needs full planning permission.

How tall can a permitted development extension be?

A single-storey extension can be up to 4m high. If any part is within 2m of a boundary, the eaves must be no higher than 3m.

Do I need a Lawful Development Certificate?

It is not legally required, but it is strongly recommended. It confirms your extension is lawful and avoids problems when you sell.

Is the guide free?

Yes. Download the PDF from this page with no sign-up. If you would like advice on your own house, book a free site visit.

Keep reading

More Planning Guides

Read our written guide to permitted development for house extensions in London, planning permission for a rear extension and loft conversions and permitted development. Borough guides: Barnet, Camden, Haringey, Brent and Harrow. Planning costs? See our house extension cost guide.

Services: house extensions, kitchen extensions and loft conversions across North and West London.

This guide is a general summary of permitted development for houses in England as at October 2026, based on the General Permitted Development Order 2015 (as amended) and the government’s householder technical guidance. It is not legal advice. Always confirm with your council or an architect before starting work.

Not sure what your house allows?

Book a free site visit and we will tell you whether your plans fit permitted development or need planning.

Get a Free Quote
★★★★★
Rated 5.0 by our clients on Google
Read our Google reviews

Ready to Transform Your Property?

Get Expert Advice & a Free Quote. We prioritize clear communication and professional results.

Whether you're planning a renovation, extension, loft conversion, or full refurbishment, our team is here to help. We provide clear advice, transparent pricing, and professional project management from start to finish.

Contact Details:

Email: info@arkivongroup.co.uk
Call / WhatsApp: 07754 690740
Office Line: 020 8830 9702

services